click image above to view full screen

Sutter Capitol Pavilion

Location: Sacramento, CA
Project type: Healthcare
Pieces installed: 323
Sq. footage: 209,781

Design task:
Sutter’s flagship site for its downtown campus required a large volume of artwork, but at a budget that reflected the difficult economic climate.  ACS found inspired ways to achieve this goal, and was able to provide high-quality, unique artwork for the entire site, without going over budget.

Key features include:
• Original and commissioned artwork throughout all four floors, including glass and metal sculptures, custom fabric art and original paintings.
• Limited editions and photography in main areas.
• A rotating art display in the first floor corridor, sponsored by a local art gallery, and featuring a rotating show of local and regional artists.